2014
• In July the total gas send-out into the national gas pipeline network exceeded 28 billion cubic meters.
• In September Adriatic LNG celebrates at the Shore Base (Porto Viro) the fifth anniversary of the terminal since the start-up.
• In Winter 2014/2015 for the first time Adriatic LNG participates in the “Peak Shaving” service: the service allows the temporary storage of LNG in the terminal's tanks, in order to meet possible supply difficulties during wintertime and ensure the security of national gas system.
| Operational results | |
|---|---|
| Carriers offloaded | 50 |
| Gas cm sent out into the national grid | 4.3 billion |
| Terminal utilization rate | 54% |
| Reliability rate | 99.8% |