2015
• In July the total gas send-out into the national gas pipeline network exceeded 33 billion cubic meters.
• In August the 400th LNG carrier arrives at the terminal. Named Lusail, the carrier comes from the port of Ras Laffan (Qatar).
| Operational results | |
|---|---|
| Carriers offloaded | 67 |
| Gas cm sent out into the national grid | 5.6 billion |
| Terminal utilization rate | 70% |
| Reliability | 99.7% |
