  • Availability of terminal capacity
  • Berthing of LNG carriers
  • LNG unloading
  • Storage
  • Redelivery of regasified LNG at Cavarzere, entry point into the Italian National Grid.

Every year during the months of June and July, Adriatic LNG offers its capacity for mid- and long-term periods (up to ten years) and, on a monthly basis, the infra-annual capacity (e.g. until the end of the thermal year).
Check -out tariffs for regasification service for the period concerned.

 

If you want to have an overview on Adriatic LNG regasification service overall costs – including the cost to enter the national network please clink on this link: Tariff Calculator

27/09/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 29 September 2021 - 2.30PM CET Available Capacity
n. 2 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 29 September 2021 - 2.30PM CET Available Capacity
n. 3 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 29 September 2021 - 2.30PM CET Available Capacity
n. 4 and n. 5 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 29 September 2021 - 2.30PM CET Available Capacity
n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 29 September 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 7-10 October 7-9 October from 65.000 to 145.000 m3liq 29 September 2021 - 5.00 PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

16/09/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 22 September 2021 - 2.30PM CET Available Capacity
n. 2 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 22 September 2021 - 2.30PM CET Available Capacity
n. 3 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 22 September 2021 - 2.30PM CET Available Capacity
n. 4 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 22 September 2021 - 2.30PM CET Available Capacity
n. 5 and n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 22 September 2021 - 2.30PM CET Available Capacity
n. 7 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 22 September 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

13/09/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 15 September 2021 - 2.30PM CET Available Capacity
n. 2 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 15 September 2021 - 2.30PM CET Available Capacity
n. 3 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 15 September 2021 - 2.30PM CET Available Capacity
n. 4 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 15 September 2021 - 2.30PM CET Available Capacity
n. 5 and n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 15 September 2021 - 2.30PM CET Available Capacity
n. 7 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 15 September 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

02/09/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 8 September 2021 - 2.30PM CET Available Capacity
n. 2 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 8 September 2021 - 2.30PM CET Available Capacity
n. 3 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 8 September 2021 - 2.30PM CET Available Capacity
n. 4 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 8 September 2021 - 2.30PM CET Available Capacity
n. 5 and n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 8 September 2021 - 2.30PM CET Available Capacity
n. 7 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 8 September 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 September 2021 17-20 September 17-19 September from 65.000 to 145.000 m3liq 09 September 2021 - 5.00 PM CET Released Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

26/08/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 September 2021 17-20 September 17-19 September from 65.000 to 217.000m3liq 1 September 2021 - 2.30PM CET Released Capacity
n. 2 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 1 September 2021 - 2.30PM CET Available Capacity
n. 3 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 1 September 2021 - 2.30PM CET Available Capacity
n. 4 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 1 September 2021 - 2.30PM CET Available Capacity
n. 5 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 1 September 2021 - 2.30PM CET Available Capacity
n. 6 and n. 7 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 1 September 2021 - 2.30PM CET Available Capacity
n. 8 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 1 September 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

19/08/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 September 2021 17-20 September 17-19 September from 65.000 to 217.000m3liq 25 August 2021 - 2.30PM CET Released Capacity
n. 2 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 25 August 2021 - 2.30PM CET Available Capacity
n. 3 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 25 August 2021 - 2.30PM CET Available Capacity
n. 4 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 25 August 2021 - 2.30PM CET Available Capacity
n. 5 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 25 August 2021 - 2.30PM CET Available Capacity
n. 6 and n. 7 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 25 August 2021 - 2.30PM CET Available Capacity
n. 8 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 25 August 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 28-31 August 28-30 August from 65.000 to 145.000 m3liq 20 August 2021 - 5.00 PM CET Released Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

17/08/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Application Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 28-31 August 28-30 August from 65.000 to 145.0005 m3liq 18 August 2021 - 2.30PM CET Released Capacity
n. 2 September 2021 17-20 September 17-19 September from 65.000 to 217.000m3liq 18 August 2021 - 2.30PM CET Released Capacity
n. 3 October 2021 7-10 October 7-9 October from 65.000 to 152.0005 m3liq 18 August 2021 - 2.30PM CET Available Capacity
n. 4 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 18 August 2021 - 2.30PM CET Available Capacity
n. 5 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 18 August 2021 - 2.30PM CET Available Capacity
n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 18 August 2021 - 2.30PM CET Available Capacity
n. 7 and n. 8 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 18 August 2021 - 2.30PM CET Available Capacity
n. 9 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 18 August 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Application Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

06/08/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Released Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 28-31 August 28-30 August from 65.000 to 145.000 m3liq 11 August 2021 - 2.30PM CET Released Capacity

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.
 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regasification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

 

30/07/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Released Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 28-31 August 28-30 August from 65.000 to 217.000 m3liq1 4 August 2021 - 2.30PM CET Released Capacity

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.
 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regasification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 12-15 August 12-14 August from 65.000 to 145.000 m3liq 4 August 2021 - 5.00 PM CET Released Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

20/07/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Released Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 August 2021 12-15 August 12-14 August from 65.000 to 145.000 m3liq 28 July 2021 - 2.30PM CET Released Capacity
n. 2 August 2021 28-31 August 28-30 August from 65.000 to 145.000 m3liq 28 July 2021 - 2.30PM CET Released Capacity

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.
 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regasification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1/03/2021

Adriatic LNG informs that following the success of the Infra-Annual Capacity Available allocation process for the current Thermal Year, all the Infra-Annual Capacity available for this Thermal year has been allocated. Then, the allocation procedures are suspended up to the publication of the Infra-Annual Capacity available for Thermal Year 2021- 2022 and/or up to any Capacity releases.

 

The Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted.

 

19/02/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 25 February 2021 - 2.30PM CET Available Capacity

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.

 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regasification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

12/02/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 18 February 2021 - 2.30PM CET Available Capacity
n. 2 August 2021 28-31 August 28-30 August from 65.000 to 217.000 m3liq2 18 February 2021 - 2.30PM CET Available Capacity

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.

 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

 

05/02/2021

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Access Reques to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 February 2021 21-24 February 21-23 February from 65.000 to 145.000 m3liq 12 February 2021 – 5.00PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

05/02/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 11 February 2021 - 2.30PM CET Available Capacity
n. 2 August 2021 28-31 August 28-30 August from 65.000 to 217.000 m3liq2 11 February 2021 - 2.30PM CET Available Capacity

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.

 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

27/01/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 February 2021 21-24 February 21-23 February from 65.000 to 185.000 m3liq2 4 February 2021 - 2.30PM CET Available Capacity
n. 2 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 4 February 2021 - 2.30PM CET Available Capacity
n. 3 March 2021 29 March - 1 April 29-31 March from 65.000 to 217.000 m3liq2 4 February 2021 - 2.30PM CET Available Capacity
n. 4 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 4 February 2021 - 2.30PM CET Available Capacity
n. 5 August 2021 28-31 August 28-30 August from 65.000 to 217.000 m3liq2 4 February 2021 - 2.30PM CET Available Capacity
n. 6 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 4 February 2021 - 2.30PM CET Available Capacity

 

We notify that in order to maximize the use of the Available Capacity and ensure greater opportunities for Operators, considering the operating conditions of the Terminal, Adriatic LNG makes available in each auction procedure all the Unloading Slots included in the 7 Working Days, after the closing day of each auction procedure.

 

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

19/01/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 25 January 2021 - 2.30PM CET Available Capacity
n. 2 March 2021 29 March - 1 April 29-31 March from 65.000 to 217.000 m3liq2 25 January 2021 - 2.30PM CET Available Capacity
n. 3 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 25 January 2021 - 2.30PM CET Available Capacity
n. 4 August 2021 28-31 August 28-30 August from 65.000 to 217.000 m3liq2 25 January 2021 - 2.30PM CET Available Capacity
n. 5 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 25 January 2021 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

 

19/01/2021

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Access Reques to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 February 2021 21-24 February 21-23 February from 65.000 to 145.000 m3liq 12 February 2021 – 5.00PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

12/01/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 February 2021 21-24 February 21-23 February from 65.000 to 185.000 m3liq2-3 18 January 2021 - 2.30PM CET Available Capacity
n. 2 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 18 January 2021 - 2.30PM CET Available Capacity
n. 3 March 2021 29 March - 1 April 29-31 March from 65.000 to 185.000 m3liq2-3 18 January 2021 - 2.30PM CET Available Capacity
n. 4 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 18 January 2021 - 2.30PM CET Available Capacity
n. 5 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 18 January 2021 - 2.30PM CET Available Capacity
n. 6 August 2021 28-31 August 28-30 August from 65.000 to 185.000 m3liq2-3 18 January 2021 - 2.30PM CET Available Capacity
n. 7 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 18 January 2021 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 185,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

04/01/2021

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 February 2021 21-24 February 21-23 February from 65.000 to 185.000 m3liq2-3 11 January 2021 - 2.30PM CET Available Capacity
n.2 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 11 January 2021 - 2.30PM CET Available Capacity
n.3 March 2021 29 March - 1 April 29-31 March from 65.000 to 185.000 m3liq2-3 11 January 2021 - 2.30PM CET Available Capacity
n.4 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 11 January 2021 - 2.30PM CET Available Capacity
n.5 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 11 January 2021 - 2.30PM CET Available Capacity
n.6 August 2021 28-31 August 28-30 August from 65.000 to 185.000 m3liq2-3 11 January 2021 - 2.30PM CET Available Capacity
n.7 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 11 January 2021 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 185,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

29/12/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 February 2021 21-24 February 21-23 February from 65.000 to 185.000 m3liq2-3 4 January 2021 - 2.30PM CET Available Capacity
n.2 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 4 January 2021 - 2.30PM CET Available Capacity
n.3 March 2021 29 March - 1 April 29-31 March from 65.000 to 185.000 m3liq2-3 4 January 2021 - 2.30PM CET Available Capacity
n.4 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 4 January 2021 - 2.30PM CET Available Capacity
n.5 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 4 January 2021 - 2.30PM CET Available Capacity
n.6 August 2021 28-31 August 28-30 August from 65.000 to 185.000 m3liq2-3 4 January 2021 - 2.30PM CET Available Capacity
n.7 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 4 January 2021 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 185,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

23/12/2020

Infra-Annual Subscripion process: UPDATE related to the Auction whose deadline is 28th December 2020 

Following the warning of many operators regarding the calendar of public holidays in some countries and with the aim of maximizing competition in the auction’s participation, for the benefit of the security of supplies and liquidity of the gas market in Italy, the deadline for sending the Offer related to the Available Capacity, during the Auction Procedure for the Subscription of the Infra-Annual Capacity referred to in the Transitional Auction Regulations and in Article 2.4.2 b) α) of Chapter II of the Code Regasification, for the auction, initially scheduled for Monday 28 December 2020, is postponed to Tuesday 29th December 2020, at 14:30 CET. The terms for accreditation remain unchanged: by 23th December 2020, 17:00.

 

22/12/2020

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Access Reques to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 January 2021 8-11 January 8-10 January from 65.000 to 145.000 m3liq 29 December 2020 – 5.00PM CET Available Capacity
n.2 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 15 January 2021 – 5.00PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

22/12/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 February 2021 21-24 February 21-23 February from 65.000 to 170.000 m3liq2-3 28 December 2020 - 2.30PM CET Available Capacity
n.2 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 28 December 2020 - 2.30PM CET Available Capacity
n.3 March 2021 29 March - 1 April 29-31 March from 65.000 to 170.000 m3liq2-3 28 December 2020 - 2.30PM CET Available Capacity
n.4 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 28 December 2020 - 2.30PM CET Available Capacity
n.5 July 2021 19-22 July 19-21 July from 65.000 to 217.000 m3liq2 28 December 2020 - 2.30PM CET Available Capacity
n.6 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 28 December 2020 - 2.30PM CET Available Capacity
n.7 August 2021 28-31 August 28-30 August from 65.000 to 170.000 m3liq2-3 28 December 2020 - 2.30PM CET Available Capacity
n.8 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 28 December 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 170,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

14/12/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2021 8-11 January 8-10 January from 65.000 to 217.000 m3liq2 18 December 2020 - 2.30PM CET Available Capacity
n. 2 January 2021 24-27 January 24-26 January from 65.000 to 170.000 m3liq2-3 18 December 2020 - 2.30PM CET Available Capacity
n. 3 February 2021 21-24 February 21-23 February from 65.000 to 170.000 m3liq2-3 18 December 2020 - 2.30PM CET Available Capacity
n.4 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 18 December 2020 - 2.30PM CET Available Capacity
n.5 March 2021 29 March - 1 April 29-31 March from 65.000 to 170.000 m3liq2-3 18 December 2020 - 2.30PM CET Available Capacity
n.6 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 18 December 2020 - 2.30PM CET Available Capacity
n.7 July 2021 19-22 July 19-21 July from 65.000 to 217.000 m3liq2 18 December 2020 - 2.30PM CET Available Capacity
n.8 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 18 December 2020 - 2.30PM CET Available Capacity
n.9 August 2021 28-31 August 28-30 August from 65.000 to 170.000 m3liq2-3 18 December 2020 - 2.30PM CET Available Capacity
n.10 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 18 December 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 170,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

9/12/2020

Following the latest capacity allocation and on the basis of the available information, Adriatic LNG updates the capacity made available in the Auction Procedure for the Subscription of the Infra-Annual Capacity, referred to in the Temporary Auction Rules and in Article 2.4.2 b ) α) of chapter II of the Regasification Code.

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2021 8-11 January 8-10 January from 65.000 to 217.000 m3liq2 11 December 2020 - 2.30PM CET Available Capacity
n. 2 January 2021 24-27 January 24-26 January from 65.000 to 170.000 m3liq2-3 11 December 2020 - 2.30PM CET Available Capacity
n. 3 February 2021 21-24 February 21-23 February from 65.000 to 170.000 m3liq2-3 11 December 2020 - 2.30PM CET Available Capacity
n.4 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 11 December 2020 - 2.30PM CET Available Capacity
n.5 March 2021 29 March - 1 April 29-31 March from 65.000 to 170.000 m3liq2-3 11 December 2020 - 2.30PM CET Available Capacity
n.6 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 217.000 m3liq2 11 December 2020 - 2.30PM CET Available Capacity
n.7 July 2021 19-22 July 19-21 July from 65.000 to 217.000 m3liq2 11 December 2020 - 2.30PM CET Available Capacity
n.8 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 11 December 2020 - 2.30PM CET Available Capacity
n.9 August 2021 28-31 August 28-30 August from 65.000 to 170.000 m3liq2-3 11 December 2020 - 2.30PM CET Available Capacity
n.10 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq 11 December 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes above 145.000m3 liq they are not binding for the first come first served allocation.

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 170,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

3/12/2020

Following the Completion of the Annual Delivery plan for 2021, on 2nd  December, Adriatic LNG updates the publication of the available slots

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n.1 Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2021 8-11 January 8-10 January from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n. 2 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n. 3 February 2021 21-24 February 21-23 February from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n.4 March 2021 17-20 March 17-19 March from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.5 March 2021 29 March - 1 April 29-31 March from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n.6 April 2021 18-21 April 18-20 April from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.7 May 2021 4-7 May 4-6 May from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.8 May 2021 20-23 May 20-22 May from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n.9 June 2021 9-12 June 9-11 June from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.10 June 2021 29 June- 2 July 29 June- 1 July from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n.11 July 2021 19-22 July 19-21 July from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.12 August 2021 8-11 August 8-10 August from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity
n.13 August 2021 28-31 August 28-30 August from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
n.14 September 2021 17-20 September 17-19 September from 65.000 to 217.000 m3liq2 4 December 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1)The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation

3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

27/11/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month-Period of the year 2021 Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2021 8-11 January 8-10 January from 65.000 to 217.000 m3liq1 4 December 2020 - 2.30PM CET Available Capacity
n. 2 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 4 December 2020 - 2.30PM CET Available Capacity
n. 3 February 2021 21-24 February 21-23 February from 65.000 to 145.000 m3liq 4 December 2020 - 2.30PM CET Available Capacity
from n.4 to n.7 Period March-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 4 December 2020 - 2.30PM CET Available Capacity
from n.8 to n.12 Period March-September 2021 To be determined2 To be determined2 5 Slots from 65.000 to 217.000 m3liq1 4 December 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period March-September 2021 will be defined starting from the month of December 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

20/11/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month-Period of the year 2021 Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2021 8-11 January 8-10 January from 65.000 to 217.000 m3liq1 25 November 2020 - 2.30PM CET Available Capacity
n. 2 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 25 November 2020 - 2.30PM CET Available Capacity
n. 3 February 2021 21-24 February 21-23 February from 65.000 to 145.000 m3liq 25 November 2020 - 2.30PM CET Available Capacity
from n.4 to n.7 Period March-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 25 November 2020 - 2.30PM CET Available Capacity
from n.8 to n.12 Period March-September 2021 To be determined2 To be determined2 5 Slots from 65.000 to 217.000 m3liq1 25 November 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period March-September 2021 will be defined starting from the month of December 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

19/11/2020

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Access Reques to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 145.000 m3liq 1 December 2020 – 5.00PM CET Available Capacity
n.2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 15 December 2020 – 5.00PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

12/11/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Month-Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 2020 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 18 November 2020 - 2.30PM CET Available Capacity
n.2 December 2020 23-26 December 23-25 December from 65.000 to 145.000 m3liq 18 November 2020 - 2.30PM CET Available Capacity
n. 3 January 2021 8-11 January 8-10 January from 65.000 to 145.000 m3liq 18 November 2020 - 2.30PM CET Available Capacity
n.4 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 18 November 2020 - 2.30PM CET Available Capacity
from n.5 to n.8 Period February-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 18 November 2020 - 2.30PM CET Available Capacity
from n.9 to n.14 Period February-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 18 November 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period February-September 2021 will be defined starting from the month of November 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

05/11/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Month-Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 2020 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 11 November 2020 - 2.30PM CET Available Capacity
n.2 December 2020 23-26 December 23-25 December from 65.000 to 145.000 m3liq 11 November 2020 - 2.30PM CET Available Capacity
n. 3 January 2021 8-11 January 8-10 January from 65.000 to 145.000 m3liq 11 November 2020 - 2.30PM CET Available Capacity
n.4 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 11 November 2020 - 2.30PM CET Available Capacity
from n.5 to n.8 Period February-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 11 November 2020 - 2.30PM CET Available Capacity
from n.9 to n.14 Period February-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 11 November 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period February-September 2021 will be defined starting from the month of November 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

28/10/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Month-Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 2020 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 4 November 2020 - 2.30PM CET Available Capacity
n.2 December 2020 23-26 December 23-25 December from 65.000 to 145.000 m3liq 4 November 2020 - 2.30PM CET Available Capacity
n. 3 January 2021 8-11 January 8-10 January from 65.000 to 145.000 m3liq 4 November 2020 - 2.30PM CET Available Capacity
n.4 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 4 November 2020 - 2.30PM CET Available Capacity
from n.5 to n.8 Period February-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 4 November 2020 - 2.30PM CET Available Capacity
from n.9 to n.14 Period February-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 4 November 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period February-September 2021 will be defined starting from the month of November 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

19/10/2020

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Access Reques to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 November 9-12 November 9-11 November from 65.000 to 150.000 m3liq 30 October 2020 – 5.00PM CET Available Capacity1

(1) Released Regulated Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

20/10/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Month-Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 2020 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 26 October 2020 - 2.30PM CET Available Capacity
n.2 December 2020 23-26 December 23-25 December from 65.000 to 145.000 m3liq 26 October 2020 - 2.30PM CET Available Capacity
n. 3 January 2021 8-11 January 8-10 January from 65.000 to 145.000 m3liq 26 October 2020 - 2.30PM CET Available Capacity
n.4 January 2021 24-27 January 24-26 January from 65.000 to 145.000 m3liq 26 October 2020 - 2.30PM CET Available Capacity
from n.5 to n.8 Period February-September 2021 To be determined2 To be determined2 4 Slots from 65.000 to 145.000 m3liq3 26 October 2020 - 2.30PM CET Available Capacity
from n.9 to n.14 Period February-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 26 October 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 are defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

16/10/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 November 9-12 November 9-11 November from 65.000 to 150.000 m3liq 19 October 2020 - 2.30PM CET Released Capacity
n.2 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 19 October 2020 - 2.30PM CET Available Capacity
n. 3 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 19 October 2020 - 2.30PM CET Available Capacity
from n.4 to n.9 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 19 October 2020 - 2.30PM CET Available Capacity
from n.10 to n.15 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 19 October 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

13/10/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 19 October 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 19 October 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 19 October 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 19 October 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

06/10/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 12 October 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 12 October 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 12 October 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 12 October 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

29/09/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 5 October 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 5 October 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 5 October 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 5 October 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

21/09/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 25 September 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 25 September 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 25 September 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 25 September 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

14/09/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 18 September 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 18 September 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 18 September 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 18 September 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

07/09/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 11 September 2020 - 2.30PM CET Available Capacity
n. 2 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 11 September 2020 - 2.30PM CET Available Capacity
from n.3 to n.8 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 11 September 2020 - 2.30PM CET Available Capacity
from n.09 to n.14 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 11 September 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

28/08/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 November 9-12 November 9-11 November from 65.000 to 217.000 m3liq1 4 September 2020 - 2.30PM CET Available Capacity
n.2 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 4 September 2020 - 2.30PM CET Available Capacity
n.3 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 4 September 2020 - 2.30PM CET Available Capacity
from n.4 to n.9 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 4 September 2020 - 2.30PM CET Available Capacity
from n.10 to n.15 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 4 September - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

19/08/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 November 9-12 November 9-11 November from 65.000 to 217.000 m3liq1 25  August 2020 - 2.30PM CET Available Capacity
n.2 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 25  August 2020 - 2.30PM CET Available Capacity
n.3 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 25  August 2020 - 2.30PM CET Available Capacity
from n.4 to n.9 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 145.000 m3liq3 25  August 2020 - 2.30PM CET Available Capacity
from n.10 to n.15 Period January-September 2021 To be determined2 To be determined2 6 Slots from 65.000 to 217.000 m3liq1 25  August 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 September 2-5 September 2-4 September from 65.000 to 145.000 m3liq 25 August 2020 – 5.00PM CET Available Capacity1

(1) Released exempted RTPA Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

12/08/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 September 2-5 September 2-4 September from 65.000 to 217.000 m3liq1 18  August 2020 - 2.30PM CET Available Capacity2
n.2 November 9-12 November 9-11 November from 65.000 to 217.000 m3liq1 18  August 2020 - 2.30PM CET Available Capacity
n.3 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 18  August 2020 - 2.30PM CET Available Capacity
n.4 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 18  August 2020 - 2.30PM CET Available Capacity
from n.5 to n.10 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 145.000 m3liq4 18  August 2020 - 2.30PM CET Available Capacity
from n.11 to n.16 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 217.000 m3liq1 18  August 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

(3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

06/08/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 September 2-5 September 2-4 September from 65.000 to 217.000 m3liq1 11 August 2020 - 2.30PM CET Available Capacity2
n.2 November 9-12 November 9-11 November from 65.000 to 217.000 m3liq1 11 August 2020 - 2.30PM CET Available Capacity
n.3 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 11 August 2020 - 2.30PM CET Available Capacity
n.4 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 11 August 2020 - 2.30PM CET Available Capacity
from n.5 to n.10 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 145.000 m3liq4 11 August 2020 - 2.30PM CET Available Capacity
from n.11 to n.16 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 217.000 m3liq1 11 August 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

(3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 August 13-16 August 13-15 August from 65.000 to 145.000 m3liq 5 August 2020 – 5.00PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

29/07/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month of the year 2020/
Period of the year 2021
Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 September 2-5 September 2-4 September from 65.000 to 217.000 m3liq1 4 August 2020 - 2.30PM CET Available Capacity2
n.2 November 9-12 November 9-11 November from 65.000 to 217.000 m3liq1 4 August 2020 - 2.30PM CET Available Capacity
n.3 December 11-14 December 11-13 December from 65.000 to 217.000 m3liq1 4 August 2020 - 2.30PM CET Available Capacity
n.4 December 23-26 December 23-25 December from 65.000 to 145.000 m3liq 4 August 2020 - 2.30PM CET Available Capacity
n.5 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 145.000 m3liq4 4 August 2020 - 2.30PM CET Available Capacity
n.6 Period January-September 2021 To be determined3 To be determined3 6 Slots from 65.000 to 217.000 m3liq1 4 August 2020 - 2.30PM CET Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With Reference to the auction procedure, it will be necessary to send 1 (one) Offer Form for each Unloading Slot you intend to make an Offer.

(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

(3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.

In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.

As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.

The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.

(4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

21/07/2020

Infra-Annual Subscripion process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 September 2-5 September 2-4 September from 65.000 to 217.000 m3liq1 27 July 2020 - 2.30PM CET Available Capacity2

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

 

14/07/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 August 13-16 August 13-15 August from 65.000 to 217.000 m3liq1 20 July 2020 - 14.30hr CET Available Capacity
n.2 August 21-24 August 21-23 August from 65.000 to 217.000 m3liq1 20 July 2020 - 14.30hr CET Available  Capacity
n.3 September 2-5 September 2-4 September from 65.000 to 217.000 m3liq1 20 July 2020 - 14.30hr CET Available Capacity2

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

 

07/07/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Maximum quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 August 13-16 August 13-15 August 217.0001 13 July 2020 - 14.30hr CET Available Capacity
n.2 August 17-20 August 17-19 August 145.000 13 July 2020 - 14.30hr CET Available Capacity
n.3 August 21-24 August 21-23 August 217.0001 13 July 2020 - 14.30hr CET Available  Capacity
n.4 August 25-28 August 25-27 August 145.000 13 July 2020 - 14.30hr CET Available Capacity
n.5 September 2-5 September 2-4 September 217.0001 13 July 2020 - 14.30hr CET Available Capacity2

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

 

16/06/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Maximum quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 August 13-16 August 13-15 August 217.0001 22 June 2020 Available Capacity
n.2 August 17-20 August 17-19 August 145.000 22 June 2020 Available Capacity
n.3 August 21-24 August 21-23 August 217.0001 22 June 2020 Available  Capacity
n.4 August 25-28 August 25-27 August 145.000 22 June 2020 Available Capacity
n.5 September 2-5 September 2-4 September 217.0001 22 June 2020 Available Capacity2

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

(2) Released exempted RTPA Capacity

 

11/05/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Maximum quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 August 5-8 August 5-7 August 145.000 20 May 2020 Available Capacity
n.2 August 13-16 August 13-15 August 217.0001 20 May 2020 Available Capacity
n.3 August 21-24 August 21-23 August 217.0001 20 May 2020 Available  Capacity
n.4 August 25-28 August 25-27 August 145.000 20 May 2020 Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

 

 

21/4/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Month Unloading
Slot
Scheduled
Arrival
range
Maximum quantity of LNG (Liquid
m3)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
May 1-4 May 1-3 May 145.000 23 April 2020 Available Capacity
May 29 May – 1 June 29-31 May 145.000 21 May 2020 Released Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

18/04/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Maximum quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n.1 May 1-4 May 1-3 May 145.000 20 April 2020 Available Capacity
n.2 May 13-16 May 13-15 May 217.0001 20 April 2020 Available Capacity
n.3 May 29 May- 1 June 29-31 May 145.000 20 April 2020 Released Capacity
n.4 June 22-25 June 22-24 June 217.0001 20 April 2020 Released Capacity
n.5 July 8-11 July 8-10 July 217.0001 20 April 2020 Available Capacity
n.6 August 25-28 August 25-27 August 145.000 20 April 2020 Available Capacity

This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

(1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.

 

21/03/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Spot April 11-14 April 11-13 April 145.000 3 April 2020 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/03/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous April 11-14 April 11-13 April 145.000 20 March 2020 Unsubscribed Regulated Capacity
Continuous May 1-4 May 1-3 May 145.000 20 March 2020 Unsubscribed Regulated Capacity
Continuous

May

13-16 May 13-15 May 145.000 20 March 2020 Unsubscribed Regulated Capacity
Continuous May 29 May - 1 June 29-31 May 145.000 20 March 2020 Released Capacity
Continuous July 8-11 July 8-10 July 145.000 20 March 2020 Unsubscribed Regulated Capacity
Continuous August 25-28 August 25-27 August 145.000 20 March 2020 Unsubscribed Regulated Capacity

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

21/02/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Spot March 2-5 March 2-4 March 145.000 21 February 2020 Unsubscribed Regulated Capacity
Spot March 6-9 March 6-8 March 145.000 27 February 2020 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/02/2020
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous March 2-5 March 2-4 March 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous March 6-9 March 6-8 March 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous April 11-14 April 11-13 April 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous May 1-4 May 1-3 May 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous

May

13-16 May 13-15 May 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous July 8-11 July 8-10 July 145.000 20 February 2020 Unsubscribed Regulated Capacity
Continuous August 25-28 August 25-27 August 145.000 20 February 2020 Unsubscribed Regulated Capacity

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

18/01/2020


Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous March 2-5 March 2-4 March 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous March 6-9 March 6-8 March 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous April 11-14 April 11-13 April 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous May 1-4 May 1-3 May 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous

May

13-16 May 13-15 May 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous July 8-11 July 8-10 July 145.000 20 January 2020 Unsubscribed Regulated Capacity
Continuous August 25-28 August 25-27 August 145.000 20 January 2020 Unsubscribed Regulated Capacity

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

21/1/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous January 14-17 January 14-16 January 145.000 3 January 2020 Unsubscribed Regulated Capacity
Continuous January 30 January-2 February 30 January-1 February 145.000 22 January 2020 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

18/12/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous January 14-17 January 14-16 January 145.000 20 December  2019 Unsubscribed Regulated Capacity
Continuous January 30 January-2 February 30 January-1 February 145.000 20 December  2019 Unsubscribed Regulated Capacity
Continuous March 2-5 March 2-4 March 145.000 20 December  2019 Unsubscribed Regulated Capacity
Continuous March 6-9 march 6-8 March 145.000 20 December  2019 Unsubscribed Regulated Capacity
Continuous

Period April –

September 2020

To be determined (*) To be determined (*) 4 slot x 145.000 20 December  2019 Unsubscribed Regulated Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

18/11/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous January 2-5 January 2-4 January 145.000 20 November  2019 Unsubscribed Regulated Capacity
Continuous January 14-17 January 14-16 January 145.000 20 November  2019 Unsubscribed Regulated Capacity
Continuous January 30 January-2 February 30 January-1 February 145.000 20 November  2019 Unsubscribed Regulated Capacity
Continuous

Period March –

September 2020

To be determined (*) To be determined (*) 6 slot x 145.000 20 November  2019 Unsubscribed Regulated Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/10/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous January 2-5 January 2-4 January 145.000 21 October  2019 Unsubscribed Regulated Capacity
Continuous January 14-17 January 14-16 January 145.000 21 October 2019 Unsubscribed Regulated Capacity
Continuous

Period February –

September 2020

To be determined (*) To be determined (*) 7 slot x 145.000 21 October 2019 Unsubscribed Regulated Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.


 

 

 

18/9/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous

Period January –

September 2020

To be determined (*) To be determined (*) 9 slot x 145.000 20 September 2019 Unsubscribed Regulated Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/8/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot 
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous

Period January–

September 2020

To be determined (*) To be determined (*) 14 (**) slot x 145.000 20 August 2019 Unsubscribed Regulated Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

(**) Indicative number of Unloading Slots. Furthermore, without prejudice to the provisions of article 3(4) of Chapter II of the Regasification Code, relating to the T.Y. 2019/2020, the number of Unloading Slots and/or Terminal Capacity in 2020 summer period could be reduced in order to allow the execution of scheduled maintenance activities and/or foreseen by the applicable legislation.

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

18/5/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot 
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous June 24 - 27 June 24 - 26 June 145.000 20 May 2019 Unsubscribed Regulated Capacity
Continuous September 4 - 7 September 4 - 6 June 145.000 20 May 2019 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/4/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous May 3 - 6 May 3 - 5 May 145.000 23 April 2019 Unsubscribed Regulated Capacity
Continuous June 24 - 27 June 24 - 26 June 145.000 23 April 2019 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/3/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous April 1 - 4 April 1-3 April 145.000 20 March 2019 Unsubscribed Regulated Capacity
Continuous May 7 - 10 May 7 - 9 May 145.000 20 March 2019 Unsubscribed Regulated Capacity
Continuous June 24 - 27 June 24 - 26 June 145.000 20 March 2019 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/2/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous April 1 - 4 April 1- 3 April 145.000 20 February 2019 Unsubscribed Regulated Capacity
Continuous April 5 - 8 April 5 - 7 April 145.000 20 February 2019 Released Capacity
Continuous May  3 - 6 May 3 - 5 May 145.000 20 February 2019 Released Capacity
Continuous May 7 - 10 May 7 - 9 May 145.000 20 February 2019 Unsubscribed Regulated Capacity
Continuous June 4 - 7 June 4 - 6 June 145.000 20 February 2019 Released Capacity
Continuous June 24 - 27 June 24 - 26 June 145.000 20 February 2019 Unsubscribed Regulated Capacity
Continuous July 6 - 9 July 6 - 8 July 145.000 20 February 2019 Released Capacity
Continuous August 3 - 6 August 3 - 5 August 145.000 20 February 2019 Released Capacity
Continuous September 4 - 7 September 4 - 6 September 145.000 20 February 2019 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

21/1/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot February 8 - 11 February 8 - 10 February 145.000 31 January Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

18/1/2019
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous February 8 - 11 February 8-10 February 145.000 21 January 2019 Unsubscribed Regulated Capacity
Continuous March 4 - 7 March 4-6 March 145.000 21 January 2019 Released Capacity
Continuous April 1 - 4 April 1-3 April 145.000 21 January 2019 Unsubscribed Regulated Capacity
Continuous April 5 - 8 April 5 - 7 April 145.000 21 January 2019 Released Capacity
Continuous May 3 - 6 May 3 - 5 May 145.000 21 January 2019 Released Capacity
Continuous May 7 - 10 May 7 - 9 May 145.000 21 January 2019 Unsubscribed Regulated Capacity
Continuous June 4 - 7 June 4 - 6 June 145.000 21 January 2019 Released Capacity
Continuous June 24 - 27 June 24 - 26 June 145.000 21 January 2019 Unsubscribed Regulated Capacity
Continuous July 6 - 9 July 6 - 8 July 145.000 21 January 2019 Released Capacity
Continuous August 3 - 6 August 3 - 5 August 145.000 21 January 2019 Released Capacity
Continuous September 4 - 7 September 4 - 6 September 145.000 21 January 2019 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

18/12/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous February 31 January -3 February 31 January -2 February 145.000 20 December 2018 Released Capacity
Continuous February 8-11 February 8-10 February 145.000 20 December 2018 Unsubscribed Regulated Capacity
Continuous March 4-7 March 4-6 March 145.000 20 December 2018 Released Capacity
Continuous Period April –
September 2019
To be determined (*) To be determined (*) 10 slot x 145.000 20 December 2018 4 slot Unsubscribed Regulated Capacity
6 slot Released Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
 

 

20/11/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot December 2-5 December 2-4 December 145.000 23 November 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/11/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous December 2-5 December 2-4 December 145.000 20 November 2018 Released Capacity
Continuous January 3-6 January 3-5 January 145.000 20 November 2018 Released Capacity
Continuous January 31 January -3 February 31 January -2 February 145.000 20 November 2018 Released Capacity
Continuous February 8-11 February 8-10 February 145.000 20 November 2018 Unsubscribed Regulated Capacity
Continuous Period March –
September 2019
To be determined (*) To be determined (*) 11 slot x 145.000 20 November 2018 4 slot Unsubscribed Regulated Capacity
7 slot Released Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

22/10/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot November 4-7 November 4-6 November 145.000 25 October 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

18/10/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous November 4-7 November 4-6 November 145.000 22 October 2018 Released Capacity
Continuous December 2-5 December 2-4 December 145.000 22 October 2018 Released Capacity
Continuous January 3-6 January 3-5 January 145.000 22 October 2018 Released Capacity
Continuous January 31 January -3 February 31 January -2 February 145.000 22 October 2018 Released Capacity
Continuous

Period February –

September 2019

To be determined (*) To be determined (*) 12 slot x 145.000 22 October 2018 5 slot Unsubscribed Regulated Capacity
7 slot Released Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
 

 

20/09/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot October 7-10 October 7-9 October 145.000 28 September 2018 Released Capacity
Spot October 27-30 October 27-29 October 145.000 19 October 2018 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/09/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Continuous October 7-10 October 7-9 October 145.000 20 September 2018 Released Capacity
Continuous October 27-30 October 27-29 October 145.000 20 September 2018 Unsubscribed Regulated Capacity
Continuous November 4-7 November 4-6 November 145.000 20 September 2018 Released Capacity
Continuous December 2-5 December 2-4 December 145.000 20 September 2018 Released Capacity
Continuous

Period January –

September 2019

To be determined (*) To be determined (*) 14 slot x 145.000 20 September 2018 5 slot Unsubscribed Regulated Capacity
9 slot Released Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
 

 

20/08/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
Spot September 17-20 September 17-19 September 145.000 7 September 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

18/08/2018

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the submission of
the Allocation Requests on the
PAR Platform
Capacity:
Released/Available
continuous September 17-20 September 17-19 September 145.000 20 August 2018 Released Capacity
continuous October 7-10 October 7-9 October 145.000 20 August 2018 Released Capacity
continuous October 27-30 October 27-29 October 145.000 20 August 2018 Unsubscribed Regulated Capacity
continuous November 4-7 November 4-6 November 145.000 20 August 2018 Released Capacity
continuous December 2-5 December 2-4 December 145.000 20 August 2018 Released Capacity
continuous

Period January –

September 2019

To be determined (*) To be determined (*) 14 slot x 145.000 20 August 2018 5 slot Unsubscribed Regulated Capacity
9 slot Released Capacity

(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

20/07/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served  criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
spot August 4-7 August 4-6 August 145.000 27 July 2018 Released Capacity
spot August 16-19 August 16-18 August 145.000 7 August 2018 Unsubscribed Regulated Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/07/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot 
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
continuous August 4-7 August 4-6 August 145.000 20 July 2018 Released Capacity
continuous August 16-19 August 16-18 August 145.000 20 July 2018 Unsubscribed Regulated Capacity
continuous September 17-20 September 17-19 September 145.000 20 July 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

20/06/2018

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code: 

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot July 7-10 July 7-9 July 145.000 29 June 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

18/06/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
continuous July 7-10 July 7-9 July 145.000 20 June 2018 Released Capacity
continuous August 4-7 August 4-6 August 145.000 20 June 2018 Released Capacity
continuous August 16-19 August 16-18 August 145.000 20 June 2018 Unsubscribed Regulated Capacity
continuous September 17-20 September 17-19 September 145.000 20 June 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

22/05/2018

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code: 

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot June 9-12 June 9-11 June 145.000 1 June 2018 Unsubscribed Regulated Capacity
Spot June 17-20 June 17-19 June 145.000 8 June 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- First Come First Served criteria.

 

 

18/05/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code: 

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
continuous June 9-12 June 9-11 June 145.000 21 May 2018 Unsubscribed Regulated Capacity
continuous June 17-20 June 17-19 June 145.000 21 May 2018 Released Capacity
continuous July 7-10 July 7-9 July 145.000 21 May 2018 Released Capacity
continuous August 4-7 August 4-6 August 145.000 21 May 2018 Released Capacity
continuous August 16-19 August 16-18 August 145.000 21 May 2018 Unsubscribed Regulated Capacity
continuous September 17-20 September 17-19 September 145.000 21 May 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

20/04/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code: 

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
Spot May 8-11 May 8-10 May 145.000 27 April 2018 Released Capacity

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- First Come First Served criteria.

 

18/04/2018
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:  

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Allocation
Requests on the
PAR Platform
Capacity:
Released/Available
continuous May 8-11 May 8-10 May 145.000 20 April 2018 Released Capacity
continuous June 9-12 June 9-11 June 145.000 20 April 2018 Unsubscribed Regulated Capacity
continuous June 17-20 June 17-19 June 145.000 20 April 2018 Released Capacity
continuous July 7-10 July 7-9 July 145.000 20 April 2018 Released Capacity
continuous August 4-7 August 4-6 August 145.000 20 April 2018 Released Capacity
continuous August 16-19 August 16-18 August 145.000 20 April 2018 Unsubscribed Regulated Capacity
continuous September 17-20 September 17-19 September 145.000 20 April 2018 Released Capacity

 

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.

 

 

20/03/2018

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra-Annual Subscription Process ‐ First Phase, the following Available Capacity: 

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Access
Request
Capacity:
Released/Available
spot April 2-5 April 2 -4 April 145.000 23 March 2018 Available
spot April 26-29 April 26-28 April 145.000 17 April 2018 Released
continuous May 8-11 May 8-10 May 145.000 15 April 2018 Released
continuous June 9-12 June 9-11 June 145.000 15 April 2018 Available
continuous June 17-20 June 17-19 June 145.000 15 April 2018 Released
continuous July 7-10 July 7-9 July 145.000 15 April 2018 Released
continuous August 4-7 August 4-6 August 145.000 15 April 2018 Released
continuous August 16-19 August 16-18 August 145.000 15 April 2018 Available
continuous September 17-20 September 17-19 September 145.000 15 April 2018 Released

 

This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infraannual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.

 

16/03/2018

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra-Annual Subscription Process ‐ First Phase, the following Available Capacity:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Access
Request
Capacity:
Released/Available
spot April 2-5 April 2 -4 April 145.000 20 March 2018 Available
spot April 26-29 April 26-28 April 145.000 20 March 2018 Released
continuous May 8-11 May 8-10 May 145.000 20 March 2018 Released
continuous June 9-12 June 9-11 June 145.000 20 March 2018 Available
continuous June 17-20 June 17-19 June 145.000 20 March 2018 Released
continuous July 7-10 July 7-9 July 145.000 20 March 2018 Released
continuous August 4-7 August 4-6 August 145.000 20 March 2018 Released
continuous August 16-19 August 16-18 August 145.000 20 March 2018 Available
continuous September 17-20 September 17-19 September 145.000 20 March 2018 Released

 

This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infraannual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.

 

 

SCHEDULE OF UNLOADING SLOTS


15/06/2021

Adriatic LNG announces that in August 2022 a plant shutdown for maintenance is scheduled with no availability of the regasification capacity (i.e. no gas redelivery) for a total duration of around 27 days and unavailability of the unloading slots for a total period of around 30 days.

This notice is based on the information available to date, any update will be published in due time.

 

This notice is an announcement of scheduled unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) and Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

 

16/11/2020

Schedule of unloading slots: annual communication provided by the Operating Company pursuant to Article 3, Chapter II of the Regasification Code.

The calendar displays the unloading slots allocated and available for subscription in the year 2021 (*), pursuant to Article 3, Chapter II of the Regasification Code.

(*) Some slots may be cancelled in case there are technical needs.

 

30/07/2020

Adriatic LNG informs that considering the relaxation of the restrictions in place with lockdown due to the Covid-19 pandemic, the restarting of various production activities is allowed with the relative availability of contractors, including international ones, to provide several maintenance activities on the off shore terminal. These activities will be always carried out in full compliance with the safety measures provided for by current legislation.

The maintenance plan scheduled for August 2020 has been consequently updated. It foresees a shut down period with zero send out from 4rd to 14th of August and a reduction of the available capacity to 2 Slots (i.e additional Slots unavailable in August vs last publication: 17-20 and 25-28 August 2020, equal to a total unavailable capacity in August of 580.000m3 liq, or approximately 354 million Sm3. The following Slot is available: 13-16 August 2020.

 

14/07/2020

Adriatic LNG informs that considering the relaxation of the restrictions in place with lockdown due to the Covid-19 pandemic, the restarting of various production activities is allowed with the relative availability of contractors, including international ones, to provide several maintenance activities on the off shore terminal. These activities will be always carried out in full compliance with the safety measures provided for by current legislation.

The maintenance plan scheduled for August 2020 has been consequently updated. It foresees a shut down period with zero send out from 3rd to 12th of August and a reduction of the available capacity to 2 Slots (i.e additional Slots unavailable in August vs last publication: 17-20 and 25-28 August 2020, equal to a total unavailable capacity in August of 580.000m3 liq, or approximately 354 million Sm3. The following Slots are available: 13-16 and 21-23 August 2020.

 

03/06/2020

Adriatic LNG informs that considering the current restrictions due to the Covid-19 pandemic and the initiatives aimed at mitigating the risk of spreading the epidemic on the offshore platform, the maintenance plan scheduled for August 2020 has been updated. The updated maintenance plan does not provide for a plant shutdown and has a limited effect on the regasification capacity by reducing the available capacity to 4 Slots in August 2020 (ie Slots unavailable 5-8 August and 9-12 August 2020, equal to a capacity unavailable of 290.000m3 liq, about 177 million Sm3).

This communication has to be considered an announcement of planned unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council of 25 October 2011 concerning the integrity and transparency of the wholesale energy market. Without further information updates, the application of other relevant regulations is reserved.

 

11/05/2020

Adriatic LNG informs that considering the current restrictions due to the Covid-19 pandemic and the initiatives aimed at mitigating the risk of spreading the epidemic on the offshore platform, the maintenance plan scheduled for August 2020 has been updated. The updated maintenance plan does not provide for a plant shutdown and has a limited effect on the regasification capacity by reducing the available capacity to 4 Slots in August 2020 (ie Slots unavailable 9-12 August and 17-20 August 2020, equal to a capacity unavailable of 290.000m3 liq, about 177 million Sm3).

This communication has to be considered an announcement of planned unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council of 25 October 2011 concerning the integrity and transparency of the wholesale energy market. Without further information updates, the application of other relevant regulations is reserved.

 

14/01/2020

The calendar displays the unloading slots allocated and available for subscription in the year 2020 (pursuant to Article 3, Chapter II of the Regasification Code).

 

15/11/2019

In the period 5-24 August 2020 a plant shutdown is scheduled for maintenance with total unavailability of the regasification capacity.

This communication has to be considered an announcement of scheduled unavailability in accordance with the Implementing Regulation (EU) n. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

The application of other relevant regulations is reserved.

 

 

KEY:

Subscribed Capacity

 

Released Capacity

Available Capacity

 

Not available Capacity

 

 

 

*Unloading Slot June 29- July 2 released on June 28.

RULES AND PROCEDURE FOR THE SUBSCRIPTION OF THE INFRANNUAL CAPACITY


How to become a user of the regasification service through the subscription procedure for the Infra-annual capacity

 

First of all, we are at your disposal to explain Our offer and the access rules to Our services, please contact us:
 

  • E-mail address: alng_mercato@adriaticlng.it
  • Lisa Roncon : +39.338.7298766, lisa.roncon@adriaticlng.it;
  • Roberta Pirotta : +39.334.8886276, roberta.pirotta@adriaticlng.it

The available capacity for subscription is published on Adriatic LNG website
The main way of allocating the infra-annual capacity is by auction.

The infra-annul capacity not allocated through auction that satisfies the criteria to qualify as Spot Capacity is allocated according to the first come first served criteria at the tariff published on the Adriatic LNG website.

Please note that the User of the Infra-annual Capacity can also have access to the Flexibility Service by participating in the corresponding allocation process.

 

I. Auction Procedure for Infra-annual capacity subscription

There are 3 steps:

 

1) Any interested party in participating at the Infra-Annual allocation capacity procedure has to satisfy the following participation requirements according to the Regasification Code as adopted in article 4 of the Implementing Auction Rules for Infra-Annual Capacity allocation (“Implementing Auction Rules”) following the conditions there indicated and deliver to the Operating Company: i. The Form of Commitments signed by the legal representative; and ii. Bid Bond

2) The reserve prices of the capacity offered in the context of the auctions procedures for the subscription of the Infra-Annual Capacity are defined, as appropriate (i) by the Operating Company and delivered to a public notary before the auction takes place or (ii) by the User that makes the capacity available according to the criteria defined at comma 1 of article 7 letters b) or c) of the TIRG 

 

3) Transmission of the offers

a) Auction offers must be sent to the Operating Company to the certified email (PEC) terminale.gnl.adriatico_mercato@pec.it using the Offer Form from hours 10.30 to hours 14.30 CET of the day of the auction.

The auction calendar for each Year is published and updated by Adriatic LNG on its website.

b) The Offer sent to the Operating Company is binding, unconditional, irrevocable and valid until 18.00 of the fourth (4th) Working Day following the day of the auction to which the Auction Offer is referred.

 

4) Results and signature of the Capacity Agreement

a) By 5.00 pm of the Day of the Auction, the Operating Company informs each Participant of the results of the session in which a purchase offer was made, in accordance with the provisions of the Regasification Code and The Implementing Auction Rules for Infra-Annual Capacity allocation.

b) Following the allocation of the Unloading Slots, according to the criteria defined in the Regasification Code and Implementing Auction Rules, the successful bidder will send to the Operating Company within 2 Working Days from the closure of the auction procedure (i) the Regulated Capacity Contract or the Spot Capacity Contract according to the cases, duly signed and (ii) the guarantees referred to in Article 10 of Chapter III of the Regasification Code.

The delivery will take place by sending the documentation to the PEC address terminale.gnl.adriatico_mercato@pec.it and must be signed by a legal representative.

The digital submission must be followed by the original sending of the guarantee.

The contents of the Access Request, the allocation criteria and the Access Conditions are provided in the applicable legislation and in the Regasification Code. The Regasification Code is an integral part of the Capacity Agreement. The Regasification Code verified by the Regulatory Authority for Energy, Networks and the Environment with Resolution no. Arg / Gas 57/11 and subsequent updates is available at the following link: Regasification Code of the Adriatic LNG Terminal.

 

 

II. Allocation of the Infra – Annual Capacity through the first come first served criteria.

 

If, at the end of the auction procedure, all the Spot Capacity has not been allocated, the Operating Company makes available for subscription and allocates the Available Spot Capacity according to the temporal order of receipt of the Access Requests (“first come first served").
 

1) Prices of the Spot Capacity offered in the context of the “first come first served” procedure as per comma 6 of article 6 of TIRG are published by the Operating Company on the Electronic Communication System, according to comma 7 of article 6 of the TIRG.

 

2) Access Requests for the Spot Capacity will be sent to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it, every day from 8.00 to 17.00 starting from the day following the closing day of the auction Procedure and up to the 5th (fifth) Working Day before the Scheduled Arrival Range of each Unloading Slot for the Spot Capacity. All documentation sent to the Operating Company via PEC must be signed using a Qualified Electronic Signature Certificate (FEQ) in PADES format or, alternatively, another similar tool and suitable for meeting the same requirements that will be assessed by the Operating Company at its unquestionable judgment.

 

3) The Access Requests will be binding, irrevocable and unconditional until 17.01 CET on the second Working Day following the transmission of the documentation via PEC, pursuant to the Regasification Code.

 

4) The Operating Company will notify the Applicants of the results including any acceptance within 17.00 CET on the day following the day of receipt of the Access Request. Following the Acceptance of the Access Request, the successful bidder will send to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it no later than 2 (two) Working Days the Spot Capacity Contract duly signed by a legal representative and the guarantees referred to in article 10 of the chapter III of the Regasification Code. The digital submission must be followed by the original sending of the guarantee.

 

Link:
Auction Rules
Auction Calendar
Forms –Procedure for the Subscription of the Infra-Annual Capacity

 

GUIDELINES & CLARIFICATIONS

 

16/09/2021

(Non binding english version)

Deviation in excess on contractual / scheduled / discharged volumes –for Thermal Year 2021/2022

Adriatic LNG provides that, similarly to the provisions for Spot Users (ref. Chap. III art. 8.12.1 letter b) of the Regasification Code) and to maximize the utilization of the Available Capacity, a deviation in excess of the volume of LNG per Slot subscribed may be allowed by the Operating Company to Continuous Users under conditions.

 

1) Foreseeable deviations and timing for the request:

1.1)  Deviation up to 10 (ten)% of the volume of LNG subscribed of a single Slot ("Deviation 10%"), shall be requested by the User at the latest by the fifth (5) business day prior to the start of the Unloading Slot.

1.2) Deviation of more than 10 (ten)% of the volume of LNG subscribed of a single Slot ("Extra Deviation") shall be requested by the User no later than the 16th (sixteen) day of the Month preceding the Month of Unloading.

 

2) Conditions:
The conditions to be met to grant the Deviation 10% or the Extra Deviation are:

  • no effects on the Subscribed Capacity and / or Redelivery of other Users; and / or
  • no effects on the Flexibility Service subscribed by the Users of the Flexibility Service; and / or
  • compatibility with the safe and reliable Terminal operations; and / or
  • compliance with the Regulations.

The Operating Company will assess whether or not the aforementioned conditions are satisfied and will provide feedback to the User.

 

3) Charges:

3.1) Deviation 10%, the following charges apply:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG within the limit of 10%: the allocation price.

The charges a) and b) will be invoiced without prejudice to the other costs provided for in the Regasification Code.

The reference volume for the purpose of determining the charge will be the greater value between the last scheduled quantity of LNG per article 3.3 of Chapter II of the Regasification Code and the quantity of LNG unloaded.

3.2) Extra Deviation, the following charges apply cumulatively:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG: the allocation price + 10 (ten)% of the cqs fee approved by ARERA and published by the Operating Company, for example:

  • Until December 31st, 2021 included: 2,552 € / m3 LNG;
  • From January 1st, 2022 to December 31st, 2022 : 2,628 €/m3 GNL.

c) opportunity cost of the unavailability and allocation costs of the Flexibility Service (valued from time to time, communicated by the Operating Company to the User at the time of  the feedback on the request for an Extra Deviation and applied to all Users in the same conditions) within the limits of the maximum tariff for the ancillary service.

 

4) Technical deviation in excess:

Pursuant to the Regasification Code, the User shall provide a schedule that is the best estimate in good faith of the quantity of LNG that will be actually Unloaded no later than the 16th (sixteenth) day of the Month preceding the Month of Unloading.

4.1) During the Unloading phase, a technical deviation up to a maximum value of 3 (three)% will be allowed, applicable to the last scheduled volume of LNG per article 3.3 of Chapter II of the Regasification Code, if compatible with the technical requirements of the Terminal ("Technical deviation") and must be duly and promptly justified by the User. The Unloading of a quantity of LNG higher than the Technical deviation shall be requested by the User per points 1.1 or 1.2 above and is not permitted without the positive feedback of the Operating Company

4.2) A User who has been allowed a Deviation 10% and unloads LNG beyond the threshold of the Technical deviation must pay the charges provided for the Extra Deviation on the whole quantity in excess from the last scheduled quantity per article 3.3 of Chapter II of the Regasification Code without prejudice to the other costs referred to in the Regasification Code

 

The terms referred to in this communication have the meaning attributed to them in the Regasification Code.

 

----------------------

 

28/05/2021

(Non binding english version)

Clarifications on contractual / scheduled / discharged volumes – deviation in excess for Thermal Year 2020/2021

Adriatic LNG clarifies that, for Thermal Year 2020/2021 only, similarly to the provisions for Spot Users (ref. Chap. III art. 8.12.1 letter b) of the Regasification Code), a deviation in excess of the volume of LNG subscribed may be allowed by the Operating Company to Continuous Users under conditions.
 

Deviations:

1) Deviation up to 10 (ten)% of the volume of LNG subscribed ("Deviation 10%"), shall be requested by the User at the latest by the fifth (5) business day prior to the start of the Unloading Slot.

2) Deviation of more than 10 (ten)% of the volume of LNG subscribed ("Extra Deviation") shall be requested by the User no later than the 16th (sixteen) day of the Month preceding the Month of Unloading.

 

Conditions:
The conditions to be met to grant the Deviation 10% or the Extra Deviation are:

- no effects on the Subscribed Capacity and / or Redelivery of other Users; and / or

- no effects on the Flexibility Service subscribed by the Users; and / or

- compatibility with the operational requirements of the Terminal; and / or

- compatibility with the Regulations.

The Operating Company will assess whether or not the aforementioned conditions are satisfied and will provide feedback to the User.

 

Charges:

1) Deviation 10%, the following charges apply:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG within the limit of 10%: the allocation price.

The charges a) and b) will be invoiced without prejudice to the other costs provided for in the Regasification Code.

The reference volume for the purpose of determining the charge will be the greater value between the last scheduled quantity of LNG and the quantity of LNG unloaded.

2) Extra Deviation, the following charges apply cumulatively:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG: the allocation price + 10 (ten)% of the cqs fee approved by the Authority and published by the Operating Company equal to 2.552 (two points five hundred and fifty two) € / m3 LNG;

c) opportunity cost of the unavailability and allocation costs of the Flexibility Service (valued from time to time, communicated by the Operating Company to the User at the time of feedback on the request for an Extra Deviation and applied to all Users in the same conditions) within the limits of the maximum tariff for the ancillary service.

 

Furthermore, it is kindly reminded and underlined that:

  • pursuant to the Regasification Code, the User shall provide a schedule that is the best estimate in good faith of the quantity of LNG that will be actually Unloaded no later than the 16th (sixteenth) day of the Month preceding the Month of Unloading.
  • During the Unloading phase, a technical deviation up to a maximum value of 5 (five)% will be allowed, applicable to the last scheduled volume of LNG, if compatible with the technical requirements of the Terminal ("Technical deviation"). The Unloading of a quantity of LNG higher than the last quantity of LNG scheduled within/ or beyond the Technical deviation must be duly and promptly justified by the User.
  • A User who has been allowed a Deviation 10% and unloads LNG beyond the threshold of the Technical deviation must pay the charges provided for the Extra Deviation without prejudice to the other costs referred to in the Regasification Code.

The terms referred to in this communication have the meaning attributed to them in the Regasification Code.